SSE
PREFoam
Tiered Stadium Seating Goes "Green"

There is little debate IF
the incorporation of tiered seating into your
theatre, auditorium, sanctuary or lecture
hall seating design is something that
enhances the experience of your audience. The
question today is HOW should architects and
builders best apply "sustainable design
principals" into the design and construction
process for this component of the building.
Until recently, compacted dirt fill;
structural steel; precast concrete or
structural light gauge metal framing were the
only methods of constructing tiered stadium
seating risers in assembly spaces. Today
there is a relatively new and innovative
approach to constructing the tiered seating
risers that is not only more efficient and
economical than the traditional methods; it
is an environmentally responsible, "Green"
solution that uses recyclable material as the
"building blocks" for the tiered seating
risers.
This section addresses one
aspect of modern day stadium seating riser
system design and construction; the design
and selection of the most environmentally
friendly tiered stadium seating system
available today. This innovative SSE
PREFoam Stadium Seating Riser
System uses Expanded Polystyrene (EPS) blocks
as the structural fill material to support
the tiered seating platforms. The blocks are
easily factory and field-cut for installation
in virtually any configuration necessary and
provide excellent acoustic quality, and, more
importantly, the use of EPS in the
PREFoam stadium seating
system as well as its use as an insulation
material in the overall construction of the
building meets many of the criteria necessary
for LEED certification. For the tiered
seating risers, it is similar to stacking
"Lego type" blocks made of EPS to form the
tiered seating platforms.
The SSE
PREFoam
Stadium Seating System &
Sustainable Building Practices

SSE is one of the
leading companies in the design and
construction industry that has taken a fresh
approach to protecting the build environment
and employing sustainable building practices.
Over the past few years, the design and
construction professions have turned their
focus to the "Greening of America."
Designers, Architects, Contractors and
Material Suppliers have taken on the
challenge of determining how to build and
furnish building’s interiors with materials
that are:
- Resource Efficient
- Made with Recyclable Material
- Environmentally Friendly
- Energy Efficient
- And Reduce Greenhouse Gas Emissions
The U.S. Green Building Council has developed a nationally
accepted system to rate the design, construction and operations of buildings.
The USGBC’s leadership in Energy and Environmental Design (LEED) is a standard
that recognizes the life-cycle cost of construction and helps guide the
performance of projects. The LEED rating system allows owners to acquire credits
by meeting certain conditions pertaining to the use of sustainable, energy
efficient and environmentally friendly products and systems.
The use of SSE
PREFoam
EPS in design and construction of stadium seating for theatres, auditoriums,
lecture halls, live entertainment venues, and sanctuary seating addresses each
of these criteria and provides a product that is both environmentally
responsible and a cost efficient solution to installation of tiered stadium
seating riser systems.
|
|
Resource Efficient
- EPS manufacturing
uses minimal energy and creates
nominal pollution. Steam is the
primary component in the manufacturing
process of EPS and the water from this
process is collected and reused
numerous times.
- With hundreds of manufacturing facilities throughout North
America, EPS is manufactured in close proximity to most building projects
minimizing the distribution radius.
- Because EPS is very light-weight, transportation costs are
minimized.
|
|
Made
with Recycled Material
- EPS building
products can be made with recycled
material content. In 2004 more than 57
million pounds of EPS was recycled.
- Tiered stadium seating systems are typically made with
approximately 10% recycled content.
- At the end of a building’s useful life, tiered stadium
seating systems constructed with SSE
PREFoam EPS fill
material can easily be removed and recycled. More than 90% of the material in an
EPS tiered stadium seating system is comprised of recyclable EPS block material.
|
Environmentally
Friendly

- EPS does not
contain harmful formaldehydes, CFC’s
or HCFC’s. The American Lung
Association’s Health House guideline
acknowledges that EPS is a safe
material for insulation and structural
support in construction.
- EPS has a high degree of resistance to moisture absorption
controlling humidity and air infiltration thus reducing the development of mold.
- The use of SSE
PREFoam
EPS in tiered stadium seating design reduces vibration, reverberation and
virtually eliminates "drumming" associated with deep base in musical
performances. By minimizing audio interference and feedback, speakers are more
easily heard and understood in large sanctuary spaces.
|
Energy Efficient

- According to the
U.S. Green Building Council, using EPS
in building construction helps reduce
energy consumption.
- SSE
PREFoam
EPS blocks for tiered stadium seating systems can be placed directly on
compacted fill, thus eliminating the need for a concrete slab under the stadium
seating risers. Because of the characteristics of EPS, it minimizes thermal
transfer, inhibits mold growth, and is resistant to insects.
|
Reduces Green House
Gas Emissions

- EPS unlike Extruded
Polystyrene (XEPS) has never utilized
any greenhouse gases in the
manufacturing process and the
manufacturing process itself does not
result in emissions of greenhouse
gases.
In
addition to the energy and environmental
benefits inherent in the use of EPS there are
a large number of efficiencies that can be
realized using the
PREFoam
EPS System as a construction solution for
tiered stadium seating.
One of the distinct advantages of a
PREFoam
tiered seating riser system is the fact that it is pre-engineered, custom
prefabricated and delivered to the site ready to be installed late in the
construction sequence; following the stud and drywall completion of the
auditorium’s demising, back and side rake walls. Because the general contractor
can work on a floor unencumbered by scaffolding, the ability to get the
auditorium "tiered seating ready" proceeds much more efficiently than was
previously realized using traditional methods of constructing tiered stadium
seating platforms.
In a typical installation, ninety percent
of the PREFoam
EPS block is delivered to the project site precut to the dimensions of the
seating risers including any necessary ramps and landings. Consistent with the
supplier’s shop drawings, blocks are pre-marked for direct placement on the
auditorium floor. Each of the PREFoam
EPS blocks is marked by area designation, platform level, row and block location
in each row of the tiered stadium riser system.
By the afternoon of the first or second
day of installation, typically the work crew is busy installing the gauge metal
steel riser plates and connecting strap hardware. The riser plates not only
serve to finish the face of the
PREFoam
platform riser, but also serve as a form for pouring the 4" horizontal concrete
platform deck. They are held securely in place with connecting straps placed
every 30" on-center.
Once the gauge metal steel risers and the connecting hardware
are in place, the intermediate step forms are attached to the face of the risers
to complete the platform assembly. At that point, the platform is ready for the
one continuous concrete pour of the horizontal platform surface. This approach
will typically save weeks off the installation schedule and reduce overall costs
by as much as 15-20% compared to traditional methods.
The incorporation of a
PREFoam
System is not only more cost efficient, but also an environmentally responsible,
sustainable, "green" approach to design and construction of tiered stadium
seating risers. |
Resources:

EPS Molders Association
"EPS Recycling," "Improved Indoor
Environmental Quality," "EPS Green Building
Credits"
Insulfoam LLC
"The Green Choice" and "Insulfoam and LEED." |
|